Feedback

phone+44 (0)845 555 5656

mail info@flexidry.com

clock Monday - Friday 8 AM - 5 PM

✖ CLOSE

Login: Password:

Sitemap

Protecting Levelling Floor Screeds

FlexiDry recommends that protection to levelling floor screeds should be carried out as soon as possible after installation.

  • The expected traffic type and volume should be considered to determine the type of protection required.
  • Instructions on heavy loadings on to the levelling floor screed should always be sort from a qualified structural engineer.

Consideration will provide the floor in perfect condition for the floor finisher to achieve best results.

Download the FlexiDry Floor Screed Maintenance Sheet pdf document for further advice on how to best protect your floor screed after it has been installed.

Screed Protection

Floor protection products can be purchased online at www.flexidryshop.com.

For further information on the types of protection available visit www.screedprotection.com.

Share |