True to what we say on the cover, FlexiDry once again achieved the perfect results, despite adverse winter temperatures creating potential hurdles throughout the entire screeding period at the Foulds School, Barnet.
FlexiDry F3 helped propel the floor screeding project for Foulds School project to a quick finish, getting the floors ready for the final floor finish right within three weeks of screeding, at a time when the winter temperature did not go beyond 10C. This was quite an achievement considering the fact that the ideal drying conditions stipulated for optimal drying of standard floor screeds is 110 days- under conditions of a controlled temperature of 20C and relative humidity of 50%.
FlexiDry fast drying floor screeds are specially formulated to provide the best results even under conditions that are not typically bound by the standard industry benchmarks. With reliable drying times and superior performance, we are proud that FlexiDry has been able to come to come to the rescue of many a screeding project where competitors have backed out.
FlexiDry is one of the most popular choices for screeding over underfloor heating, and has delivered exceptional results on time and within budget, for a wide range of floor surfaces across the UK.
Following the success of the Foulds School project, FlexiDry has now been chosen by client Neilcott Construction for four of their subsequent projects. We are also delighted that this project has won the screeding contractors, CSC Screeding Ltd, the nomination for the FPDC technical award for 2011.