High footfall areas such as shopping centres require the complete reliability that FlexiDry fast drying floor screed provides, to ensure a reliable substrate for the final floor surface.
- Heavy duty FlexiDry F3 fast drying floor screed was installed on Underfloor Heating at a depth of +150mm at Westfield Stratford City Shopping Centre next to the 2012 Olympic Village

- FlexiDry fast drying floor screed 7 day dry time (F1) was used at the new flagship Armani clothing store in Spinningfields, Manchester

- FlexiDry F0, ddry in just 3 days, fast drying floor screed was installed at the new Wasabi sushi and bento restaurant in Hammersmith Broadway Shopping Centre
- FlexiDry F1 (7 day) and FlexiDry F2 (14 day) fast drying floor screeds were used on the mixed Retail sites* at the new Beaconsfield Service Station off the M40


* Retail sites include McDonalds, Marks & Spencer Simply Foods, Starbucks, KFC and W H Smith
- FlexiDry F3 - 21 day fast drying floor screed was used on an installation at the Primark store in East Ham, London.
- FlexiDry F1 - 7 day fast drying screed has also been used on a number of other retail projects including a new build supermarket for Morrisons in Dover & Coolings Garden Centre in Seven Oaks