From schools to colleges and university extensions, FlexiDry fast drying floor screed is widely specified across the education sector. With many projects needing to be completed in tight timescales, FlexiDry screed helps speed up drying times.

- A further BSF project which used FlexiDry F1 - 7 day fast drying floor screed was at Earsham Primary School, Norfolk.
- FlexiDry F2 - 14 day fast drying floor screed was installed at Uxbridge College's new £6m sports hall for Main Contractor Kier Group. The sports hall was built using sustainable materials and construction processes.

- Another BSF project at St Michaels School, Kings Lyn, Norfolk used FlexiDry F1 - 7 day fast drying floor screed. This state-of-the-art school will include a multi-use games area, school hall, library and kitchen. The design will be highly energy-efficient, incorporating sustainable features such as the use of roof-mounted solar panels to pre-heat water.
- FlexiDry F1 - 7 day fast drying floor screed was also used in an installation for Kier at Westminster Kingsway College, London.