FlexiDry fast drying floor screed enables quicker completion of both new builds and refurbishment projects for offices and business space fit-outs.

  • FlexiDry F1 - 7 day dry floor screed was installed at the new Rolex flagship store at One Hyde Park in Knightsbridge where the truck delivering the bulk materials was transported 3 floors in a 30 tonne vehicle lift.

Screeding with FlexiDry floor screed at Rolex One Hyde Park

  • In excess of 4,200sm of FlexiDry F3, 21 day dry time, floor screed is currently being installed over 5 floor levels in the building of the new Harrow Central Mosque.

Screeding with FlexiDry floor screed at Harrow Mosque

  • 1100sm of FlexiDry F1 - 7 day fast drying floor screed was installed at the Roca Art Gallery in Imperial Wharf, Chelsea. The final floor finish installed on the screed by Puur Floors was a high end designer, decorative coating.
  • The new FlexiDry F1 - 7 day fast drying floor screed has been installed on a UFH system for main contractor Killby & Gayford at the Sacred Heart Church in Wimbledon as part of its £1m refurbishment.

Floor Screeding at The Scared Heart Church, Winbledon

  • Watermark Place London - New Riverside Development . FlexiDry F1 - 7 day fast drying screed was used over the under floor heating system for the main Contractor Sir Robert McAlpine.

FlexiDry fast drying floor screed at Watermark Place

  • Beaconsfield Service Station required different types of screed system to meet a demanding programme including a standard 1:4 Cement / Sand Fibrescreed plus FlexiDry F1 - 7 day fast drying floor screed.

Screeding at Beaconsfield Service Station

  • FlexiDry F3 - 21 day fast drying floor screed was installed on UFH at the new environmentally friendly Burnham Park Centre. The whole building will be warmed using a ground source heating system bored 100 metres into the earth beneath the centre's front gardens.
  • FlexiDry F1 - 7 day fast drying floor screed was used in a project at Regent's Place One. The estate comprises 1.1 million sq ft of office, retail and leisure space. Over the next few years, the estate is set to nearly double in size and will become home to around 14,000 workers and residents.