+44 (0)845 555 5656
info@flexidry.com
Monday - Friday 8 AM - 5 PM
Login: Password:
Mar 17 2011The correct methods of moisture testing should be carried out, recorded and presented to the client PRIOR to the application of final floor finishes to avoid future failure.
Feb 24 2011Any load put upon a screeded floor is initially carried by the floor finish and the floor screed beneath. This load-spreading screed layer disperses the point load across the floor area.
Jan 19 2011Screed reinforcement is a recommendation for use in screed constructions. There are various options....
Jan 18 2011We have just carried out a CM Moisture Test on the FlexiDry screed installed at the new Westfield Shopping Centre.
Dec 22 2010Take a look at the December version of our ebulletin online where we review our favourite fast drying floor screeding installations
< 1 2 3 4 5 > Last »
Categories
Tags
More